Description: Deposit Work 2024 2025 Rehabilitation of Kootayi kudivella padhadhy Replacement of distribution pipe across the river Tirur Ponnani in Jaladhara WSS Mangalam GP in Malappuram District Name of Work Deposite Work 2024 2025 Rehabilitation of Kootayi kudivella padhadhy Replacement of distribution pipe across the river Tirur Ponnani in Jaladhara WSS Mangalam GP in Malappuram District
Details: Supply of HDPE Pipe PE 100 (IS 4984/1995), 12.5kg, 110mm Outer Dia.Distribution pipe line Laying HDPE pipes (IS : 4984) on land portion including conveying within initial lead and aligning the pipes, electro-fusion welding using automatic or semi-automatic electrofusion machines, testing the pipeline thus fabricated to suit the hydraulic working pressure and after testing, aligning the pipeline, lowering the pipe in position into the trenches already made, testing the line to suitable pressure with potable water before back filling and levelling the trenches including all labour charge, hire for appliances etc., complete but excluding cost of pipe and fittings: 110mm Nominal Outer Diameter Pipes. Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.
Sector: Rural Misc