Details: fitting and erecting a type pole without using cross arm, insulators and f clamp for stringing ab cable. loading ht psc pole from the stacking place and unloading the same at work site (transport by vehicle). loading ht a type pole from the stacking place and unloading the same at work site (transport by vehicle). transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. fitting one set ab switch and giving connection fitting and erecting 9m psc pole with out v cross arm,pin insulator and f clamp for ab cable stringing dismantling (without damage) one 11kv psc/rcc pole after disconnecting stays, strut etc. and stacking the same. fitting and erecting one ht a type pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. transferring lt 3ph 4/5 wire oh line to newly erected ht/lt pole and refitting all items to the new pole. providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all mate
Sector: Power Sector