Details: stringing of 11 kv aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated messenger through existing poles of anchor clamp / dead end clamp for 11kv abc of any size of suspension clamp for 11kv abc of any size fitting and erecting one ht a type pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. loading ht a type pole from the stacking place and unloading the same at work site (transport by vehicle). fitting and erecting one ht dp using a type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. fitting and providing one strut using a type pole incl. digging & back filling pit. providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). fitting one additional 75x40mm, 1.8m channel cross arm in existing single pole incl. conveyance of materials. fitting and providing one ht stay for 11kv pole incl. digging & back filling pit. transporting
Sector: Power Sector