Details: civil work 2.32clearing grass and removal of the up to a distance of 50 m outside the periphery of the areacleared. 15.2.1demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalentdesign mix) 2.8.1earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplusexcavated soil as directed, within a lead of 50 m.all kinds of soil 2.26.1extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.all kinds of soil 2.25filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating
Sector: Industries and Factories