Details: appendix i-constructing thanthrimadom clearing the site earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) random rubble masonry in cement mortar 1:6 (1cement:6coarse sand) with hard stone in foundation and plinth upto plinth level providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) ce
Sector: Religious building