Details: electrical works design, manufacture and supply and installation of factory fabricated ss 304 22 / 24 gauge sheet metal constructed ducting complete with ss 304 angles, bolts, nuts supply and installation of ss 304 channel for bottom side of the existing blower base frame bottom side od446_p960008/2024_2025erection charge of facory fabricated ss duct including transportation from the factory to guruvayur temple conveying to the roof top of temple using crane conveying to the location using man power etc.as required od445_p960008/2024_2025dismantling the existing gi duct at the temple roof conveying using man power at roof end and placing at the ground floor using crane etc. transporting to the section store etc as required.
Sector: Religious building