Details: erecting one lt psc pole in position incl. digging & back filling pit. renewal of existing damaged/broken old lt stay with existing stay rod. installation of pre-insulated straight through joints for 16sqmm cable fitting and providing one ht stay for 11kv pole incl. digging & back filling pit. providing one coil earth using gi earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. insertion of one ht psc pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. installation of insulation piercing connector for main to service line main :16-95 sqmm, tap : 4-35 sqmm installation of insulation piercing connector for main to service line main :16-95 sqmm, tap 16-95 sqmm providing one earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling. singe phase satellite connectors upto 4 service main connections (25-95 abc/2.5-25 sqmm sm wire-2no) loading ht
Sector: Power Sector