Details: dismantling (without damage) one km lt additional conductor line, cross arms, insulators and stacking the conductors in rolls. loading ht psc pole from the stacking place and unloading the same at work site (transport by vehicle). loading lt psc pole from the stacking place and unloading the same at work site (transport by vehicle). transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. stringing of 1.1 kv aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated messenger through existing poles of anchor clamp / dead end clamp for lt abc of any size of suspension clamp for lt abc of any size installing one no. insulation piercing connector of size main :16 to 95 ,tap:1.5 to 16 sq.mm providing cable tie installation of pre-insulated straight through joints for 16sqmm cable installation of pre-insulated straight through joints for 70sqmm cable installation of pre-insulated straight through joints for 50sq
Sector: Power Sector