Details: renovation works 15.28.2 : dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :asbestos sheet 15.17.2 : dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:channels, angles, tees and flats 15.14.2 : dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:of sectional area below 40 square centimeters 100.98.1008 : engaging coolie 15.7.4 : demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar 50.6.2.2 : solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to is 2185 part i of 1979 for super structure up to floor two level with thickness 15cm in : cm 1:6
Sector: Sports