Details: labour installing one no. 4 way satellite connector of size main :16 to 95, tap:4 to 35 sq.mm to the lt ab cable of standard size transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. erecting one lt psc pole in position incl. digging & back filling pit. loading lt psc pole from the stacking place and unloading the same at work site (transport by vehicle). providing strut using lt psc pole incl. digging & back filling pit. additional rate for excavation of one pit for lt pole/lt stay in laterite. additional rate for excavation of one pit for lt pole/lt stay in hard laterite. providing stay for lt poles incl. digging & back filling pit. renewal of existing damaged/broken old lt stay with existing stay rod. providing one coil earth using gi earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. transporting lt abc by hired vehicle to a distance up to 5 km and carring up to 2 drum incl
Sector: Power Sector