Details: concrete road od288299/2023_2024excavation in soil with jcb or similar machines with lead upto 100 m = excavation for roadway in soil bymechanical means including cutting and pushing the earth to site of embankment upto a distance of 100m, including trimming bottom and side slopes in accordance with requirements of lines, grades andcross-sections. od286793/2023_2024[derived from dar 2.25] filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by rammingand watering, lead up to 50 m and lift up to 1.5 m. od240161/2023_2024(derived from dar 51.2.3)<br>filling with quarry muck<br>filling up low lying and water logged areaswith local material/ quarry muck, spreading in layers, leveling<br>the top at site and consolidation byramming, etc complete for improving the cbr value of subgrade 75.8.1providing plain cement concrete for road work cc 1:2:4 (1 cement: 2 fine aggregate: 4
Sector: Industries and Factories