Details: laying and jointing pvc pipe. heading transporting poles by hired vehicle to a distance upto 5kmand carrying upto 4 poles excluding loading & unloading insertion of one lt psc pole in existing 3ph oh line incl.digging & back filling pit,fitting cross arm, insulator,binding etc loading lt psc pole from the stacking place and unloadingthe same at work site (transport by vehicle) renewal of existing damaged/old lt psc/rcc(3ph line) pole with new psc pole in place and refitting of allitems incl. conveyance (except pole) renewal of existing damaged/old lt strut with newpsc strut in place and refitting of all items incl. conveyance (except pole) renewal of damaged lt fly stay with new fly stay incl.renewal of new psc pole (used for fly stay) and refitting of allitems, conveyance (except conveyance of pole) providing stay for lt poles incl. digging & back filling pit renewal of existing damaged/old lt stay with newstay in place and refitting of all items and conveyance of all materials recond
Sector: Power Sector