Details: picking 40mm broken stone from yard and stacking at convenient place for reuse as directed by the departmental officers at site collecting 6mm broken stone from the yard and stacking at suitable place including conveyance etc co earth work in excavation by mechanical means (hydraulic excavator) or manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil, with in a lead of 50 m. ( all kinds of soil) centering and shuttering including strutting, etc. and removal of form for: foundations, footings, bases of columns, etc for mass concrete providing and laying in position specified grade of cement concrete excluding the cost of centering and shuttering - all work up to plinth level:1:4:8 1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) steel reinforcement for r.c.c. work including
Sector: Power Sector