Details: clearing jungle including uprooting of rank vegetation, grasss, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level including removal of up to a distance of 150 m outside the periphery of the area cleared earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil. earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. in ordinary rocks. extra for every additional lift of 1.5 m or part there of in excavation / banking excavated or stacked materials,in ordinary rocks ea
Sector: Power Sector