Details: civil work 3.15.2compacting original ground(ii) compacting original ground supporting subgrade loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of tables 300.1 and 300.2 for subgrade construction as per technical specification clause 303.5.2. 4.11.2 granular sub-base/base/surface course with local materials (table 400.13) by mix in place method normal.construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per clause 401.4 as per technical specification clause 408.(ii)using gravel mix soil. 75.8.1.1providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate
Sector: Industries and Factories