Details: drainage completion 3.5.1 excavation in cutting in soil by manual means with lead upto 50 m excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 od21062/2024_2025filling with quarry muck <br> filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the cbr value of subgrade 11.4.1.1 providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 i.p.c.c grade m 10 (i)nominal mix 1:3:6 11.4.3.1 providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 iii.p.c.c. grade m 20 (i)nominal mix (1:2:4) 12.5.2.1 plain/reinforced cement concrete in substructure complet
Sector: Industries and Factories