Details: appendix a od320737/2021_2022 :amount payable by bidder for removing the accumulateds sand/silt from the river bed as is where is condition from the demarcated area using while strictly adhering to the safety conditions . the sand so removed shall not be deposited in irrigation land/river bank so that the sand should not reenter in to the river course. the removed sand can be disposed of by the bidder commercially. the sand removal shall be carried out under the following conditions: 1. the sand has to be excavated using mechanical means(hydraulic excavator/dredger/grab), manual means over an area exceeding 30cm depth, 1.5m width as well as 10sqm in plan. collection and conveying of river sand(dry/wet) as is where is condition.
Sector: Irrigation