Details: cutting and welding of acc tubes:this work involves cutting the marked pipe, edge preparation and welding the pipe with ibr welder including scaffolding arrangements necessary pipe will be supplied by the tangedco at free of cost. charges for t&ps such as grinding machine, welding electrode drying oven and consumables such as cutting wheel, cotton waste, soap solution, gloves, etc.,
Sector: Power Sector