Description: Condenser water chamber front Name of Work NCTPS II M II Circle TM Dn ACS SDn III Unit II Condenser water chamber front A1 A2 B1 B2 passes renewal of damaged condenser inlet outlet partition plate by fabrication and rectification replacement of manhole door assembly including material during annual overhaul for the year of 2025 2026
Details: Fixing of scaffolding & platform arrangement work in condenser water box areas including scaffolding materials, T & P and consumables. Charges for fabrication and of condenser water box partition plate with side supports A1,A2,B1&B2. Work involves fabrication, profile cutting, grinding, complete welding, including cost of leading, lifting of fabricated partition plates through 600NB manhole doors, Hire charges for crane, winch and T&P’s. Charges for dismantling of corroded/damaged condenser water box partition plate in Work involves cutting of partition plate in A1,A2,B1&B2, leading, lifting to ground level. dismantled partition plate are to be taken outside of condenser through 600NB manhole doors, charges including crane, winch and T&P’s. Devoluted the scrap material to stores. Charges for rectification/replacement of corroded/damaged condenser water box and cooling water outlet pipe manhole door. Work involves cutting of manhole door assembly, worn out portion replaced wi
Sector: Power Sector