Description: as per NIT Name of work Dismantling of existing floor and wall tiles and providing new tiles replacing the existing wash basin water closet urnials and other accessories in the existing toilets of 3rd floor and 4th floor Ladies Toilet I and SE GCC I CE CEDC in the office of Chief Engineer Transmission Projects I Superintending Engineer GCC I Chennai at Guindy 230 KV GIS SS Campus
Details: Dismantling floor tiles & wall tiles in the existing toilets including removing of debris , including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site. Dismantling of PCC in the existing toilets including removing of debris , including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site. Providing and Applying CFTRI approved two component flexible polymer modified acrylic cementitious water proofing coating with a mix ratio of (1 Liquid: 2 Powder), to the RCC surface like bathroom, toilet,balcony & utility area applied @ 1.7kg/m2 in 2 coats to achieve 1mm DFT, having Elongation at break >50% as per ASTM D 412, Tensile strength >1N/ mm2 as per ASTM D 412, Adhesion strength: 0.80 N/mm2 as per ASTM D 4541, bridging upto 1mm as
Sector: Power Sector