Description: Inner repair works to the P 5 1 to P 5 6 quarters at Vallur camp Name of Work NCTPS CM Circle CM II Inner repair works to the P 5 1 to P 5 6 quarters at Vallur camp
Details: NCTPS – CM Circle – CM-II- Inner repair works to the P-5/1 to P-5/6 quarters at Vallur camp. Dismantling the existing Indian Water closet and surki around the closet and clearing the site and disposing the debris away from the site including the cost of all labour, lead, lift, T&P, etc., complete.. Dismantling the brickwork and clearing the site and disposing the debris away from the site including the cost of all labour, lead, lift, T&P, etc., complete. Patch plastering the ceiling in cm 1:3 mix 20mm thick over brick wall / concrete surface after removing the peel off/ damaged plaster as directed at site including the cost of all materials, labour, lead, lift, T&P etc., complete. Patch plastering the wall/ceiling in cm 1:5 mix 12 mm thick over brick wall surface after removing the peel off/ damaged plaster surface as directed at site including the cost of all materials, labour, lead, lift, T&P etc., complete. Providing and fixing of new Country Wood door frame of size (100 x 50mm) fo
Sector: Power Sector