Details: earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per ss 20b for narrow foundation. filling with river sand including cost and coveyance of all materials to work site and all labour charges etc. cement concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. supply and febrication of steel including cost and conveyance and all labour charges etc,, complete. rcc 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. refilling foundation and basement with excavated earth in layer including all cost and conveyance of materials etc.., complete. supplying and for sides and soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charge etc., brick work
Sector: Municipality