Details: earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 vi (s2) vii.9,10 for pipe line works supply and fixing of g.i. and pvc pipes and specials and electrical items as per i.s. specification including packing, loading, unloading, freight, stacking and transist insurance etc.complete as per standard specification. 3" pvc pipe 3" pvc tee 3" pvc bend 3" gatevalve 3" mta 3" x 2" reducer 3" endcap laying and jointing of pvc pipe and specials including conveyance of all
Sector: Municipality