Details: earthwork excavating and depositing on bank with initial lead and lift of 10m and initial lift of 2m in sand, silt or other loose soil, wet sand or silt not under water, black cotton soil, sandy loam and ordinary soil including removal of excavated earth as per ss 20 a. plain cement concrete 1:4:8 mix (one cement, four fine aggregate and eight course aggregate) using 40mm iss hbg metal including all cost conveyance of materials and labour charges including vibrating charges etc. complete as per standard specification. providing of granular sub base using grade i materials of table 400 -1 of morth with minimum cbr 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at omc and compacting with vibratory roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. morth - iv no. 111,112,401,900 providing and laying, spreading and compacting graded stone
Sector: Municipality