Details: earthwork open excavation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and depositing the excavated earth within the compound in places shown by departmental officers with an initial lead of 10m and lift of 2m and clearing and leveling etc. complete complying with standard specification. supplying and filling in foundation and basement with well gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. plain cement concrete 1:4:8 (one part of cement, four part of crushed stone sand (m- sand) and eight part of coarse aggregates) using 40mm size iss hbg metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification centering for soffits o