Details: advance patch work 13.20mm providing advancve patch work using 50mm consolidated thickness by using 1 m3 of 13.20mm irc metal with 44kg of bittumen per 1 m3 of metal for pre mixing for existing surface advance patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70kn power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of morth rev - v specifications providing and laying tack coat of 2kgs/10 sqm over the bt surface trea
Sector: Municipality