Details: dismantling rcc by manual / by using deploying machineries dismantling plain cement concrete earth work excavation in all classes of soil such as hard stiff clay, stiff black cotton soil, hard redearth mixed with 50% fair sized boulders and hard gravelly soil and depositing on bank with initial lead and lift as per ss 20b inclusive of shoring strutting waling and baling out water where ever necessary forming protective bounds, coffer dams and including reilling charges around and all other incidental charges etc. complete complying with standard specifications for foundation ss no.23 ssrb (for culvert’s) plain cement concrete 1:4:8 (one cement four sand eight metal) mix using 20mm size iss guage hbg metal including cost and conveyance of all materials to site from approved quarry excluding cost and conveyance and fabrication of steel but including cost of cement which will be procured by the contractor at his own arrangements including conveyance of cement to the work site and handlin
Sector: Municipality