Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 earthwork excavation for pipe laying works having bed width 0.75m and 1.05m depth for 150mm di pipes twad sor wd-w0664 refilling for pipe laying works having bed width 0.75m and 1.05m depth for 150mm di pipes twad sor wd-w0664 earthwork excavationfor pipe laying works having bed width 0.8m and 1.05m depth for 200mm di pipes twad sor wd-w0665 refilling for pipe laying works having bed width 0.8m and 1.05m depth for 200mm di pipes twad sor wd-w0665 earthwork excavation for pipe laying works having bed width 0.8m a
Sector: Municipality