Details: dismantling the damaged reinforced cement concrete as per the instruction of dept officers etc., complete desilting the existing drain etc complete as per direction of departmental officers. dismantling the cc etc., complete earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of engineer-in-charge cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm gauge hand broken granite stone ‘elly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. centering with steel centerin
Sector: Municipality