Details: for pole above 8.00m length by using jcb/manual of rcc, rec, psc poles above 8.00m length by using crane / manual loading of various sizes of poles all rec, rcc pole above 8.00 m length unloading of various sizes of poles all rec, rcc pole above 8.00 m length fixing of tapping channel cross arm fixing of lt 3 phase cross arm fixing of ht / lt ti fitting of v cross arm fixing of ht porcelain or polymer pin insulator with pin 11 kv fixing of ht strain disc 11 kv (1set-6 nos) of stay set complete with fixing up stay wire eye, bow, guy shackle, binding etc. excavation of stay pit and burial of stay rod. earthing of poles with gi wires 4 or 6 swg by coil earthing concreting with 1:4:8 mix using 40 mm jelly including curing (material + labour) sleeve concreting paving and stringing of conductors of 7/3.15mm aaac or other equivalent conductor of 11/22kv ab switch (vertical) of h.g. fuse ht-las fixing pipie earthing including excavation of earth pit and fixing earth pipe 3 m len
Sector: Power Sector