Description: MTPS I TM I Unit IV Removal and Re Insulation of 210MW LMW Design Turbine and its auxiliaries during COH 2025 26 Name of Work MTPS I TM I Unit IV Removal and Re Insulation of 210MW LMW Design Turbine and its auxiliaries during COH 2025 26
Details: Removal and Re-Insulation of 210MW LMW Design Turbine and its auxiliaries:1. Removal of existing insulation from Top & Bottom casings of HP,IP and Middle part of LP casing, Crossover Pipes, Gland steam pipe lines ,spindle leak off lines, Transfer pipe lines ESV,IV and removing insulations from bottom casing connected pipe lines up to below 2 meter level and disposed-off removed insulations to a location identified by the Engineer-in-charge. a). Removing of Insulation HP Turbine Top & Bottom casings. b. Removing Insulation from IP Turbine Top & Bottom casings. c. Removing Insulation from LP Turbine casing. d. Removing Insulation from Cross Over pipes. e. Removing Insulation from ESV, IV Spindle leak off lines, Gland steam pipe lines etc., f. Disposal of removed Insulation from Turbine floor to reject yard. 2. Providing Ceramic blanket insulation over Top & Bottom casings of HP,IP ,middle part of LP casing, IPT exhaust part ,transfer pipe lines, HP & IP con
Sector: Power Sector