Details: charges for arranging scaffolding, complete cleaning of inside & outside cylinder, turn buckle, tie rod, etc. using cotton waste / gada cloth and air washing, checking the turn buckle, spring and tie rod thread condition, removal of rust formed by scrapping, cleaning rust on threads of turn buckle tie rods, marking hot & cold hanger loading position, making adjustment for the proper loading and strengthening of weakened supports charges for removal of worn out/ damaged insulation and aluminium sheet from boiler pipe lines. charges for cutting of new/old ceramic blanket/wool mattress for required size and fixing on boiler pipes. t&ps and consumables
Sector: Power Sector