Details: ordinary soil ss20a earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2 m in sand, silt or other loose soil, wet sand or silt not under, light black cotton soil sandy loam and ordinary soil including excavated earth ss.20.b providing and laying, spreading and compacting graded stone aggregates to wet mix macadam 250mm thick specification including premixing the materials with water at omc in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/ base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of morth providing and laying prime coat over wbm/ wmm surface using 7kg of emulsion bitumen (ssi) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, la
Sector: Municipality