Details: earth work excavation for foundation in ordinary soil light black cotton sandy loam and dry silt including shoring, strutting, baling (or) pumping out wter wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the dept. officers with initial lead and lift etc., complete as per standard specifications. -open excavation providing granular surface base to the required surface using murram, granular soil of size varying from 4mm to 75mm including cost of material and cost of labour for stacking, spreading and consolidating layer by layer (each layer not exceeding 100mm) including hire charges of roller etc, complete as per the direction of departmental officers. providing laying spreading and compacting grading aggregates to wet mix macadam specification in 200mm thick in two layers each layer in 100mm thick inlcuding premixing the materials with water at omc in mechanical mix plant
Sector: Municipality