Details: earthwork for foundations in all soils and subsoils to full depth as may be directed,except in hard rock requiring blasting including shoring, strutting and baling out water wherever necessary and refilling the sides of foundations with excavated earth in layers not exceeding 15 cm thick,well rammed and consolidated and depositing the surplus earth in places shown within initial lead and lift including levelling the site etc. complete complying with standard specifications. (footings) earthwork for foundations in all soils and subsoils to full depth as may be directed,except in hard rock requiring blasting including shoring,strutting and baling out water wherever necessary and refilling the sides of foundations with excavated earth in layers not exceeding 15 cm thick,well rammed and consolidated and depositing the surplus earth in places shown within initial lead and lift including levelling the site etc. complete complying with standard specifications. (grade beam) bored pile 400mm d
Sector: Municipality