Details: providing laying spreading and compacting grading aggregates to wet mix macadam specification in 200mm thick in two layers each layer in 100mm thick inlcuding premixing the materials with water at omc in mechanical mix plant carriage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density etc., complete providing and laying of tack coat using emulsion bitumen at the rate of 2.00 kg/10m2 over thebt surfaceurface preparatory to another bituminous construction over it mort & h., complete providing and laying of tack coat using emulsion bitumen at the rate of 7.00 kg/10m2 over the prime coated surface in wet mix macadam preparatory to another bituminous construction over it mort & h., complete providing and laying of tack coat using emulsion bitumen at the rate of 2.50 kg/10m2 over the prime coated surface in wet mix macadam preparatory to another bi
Sector: Municipality