Details: providing and laying tack coat of 2kgs/10 sqm over the bt surface treated with binder using 2 kgs of bituminous emulsion (rs) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of morth specifications providing and laying 50mm consolidated thick dense bituminous macadam using 0.24cum of 26.50-13.20mm, 0.25 of 13.20-2.36mm and 0.23 of 2.36mm & below and with 53.20kgs of vg30/vg40 bitumen for premixing per 10sqm including cost and conveyance of all materials to cmp site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc., including l
Sector: Municipality