Details: providing and laying, spreading and compacting graded stone aggregate to wet mix macadam (wmm) specification including premixing the material with water at omc in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of morth specifications. providing and laying tack coat of 7kgs/10sqm over unprimed surface treated with primer using 7kgs of bituminous emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the reqired quantity of bituminous binder as tack coat manually etc..., complete. applying tack coat over existing surface using 2.5 kg of bitumen emulsion per 10 sq.m including cost and conveyance of bitumen emulsion and labour charges for cleaning & preparing the road surface and applying required quantity of bitumen emulsion as tack coat
Sector: Municipality