Description: Renovation work for Executive Engineer OandMKurinjipady room at Kurinjipady Name of Work Renovation work for Executive Engineer O M Kurinjipady room at Kurinjipady
Details: cabin renovation work Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of wallsBrick / Stone in Clay Walls under 3m high and clearing the debris away with a lead for above 10m upto 100 m Dismantling the existing damaged aluminium partition including removing frames,hinges,fastening etc., devoluting them to stores Dismantling the existing damaged doors including removing frames,hinges,fasteningetc., devoluting them to stores. Fabricating Supplying and fixing in position of Aluminium anodised natural colour matt finish 1/3rd fixed glazing 2/3rd prelaminated board of Aluminium partition. The outer frames Outer frame: 63.50x38x3mm@ 1.72 kg/m,Centre mullions: 63.50x38x3mm@ 1.55 kg/m,Alu. Clips: 17.27x17.15x1.50mm @ 0.175kg/mg/m for intermediate vertical mullion 90cm c/c. Horizontal mullion at 1.00m 2.10m covered with 5.5mm thick plain glass with neccessary aluminium clips of size 17.27x17.15 x1.50mm @ 0.176kg/m and with required rubber beading
Sector: Power Sector