Details: of distribution transformer structure excavation of structure pole pit 2x3x1/6 th of height of 9.14 m rcc/9.0 mtr psc /rsj pole transporting of 9.14 m poles from road side to pole pit structure pole mass concreting and coping 0.6x0.6x1.65 for dp structure including cost of materials and cement. of structure materials complete such as top channel, seating channel, belting angle, cross bracing. dpdc channel, t.i. fitting etc., in complete. of hg fuse set with transport of 11 kv ab switch complete set with transport transformer structure grounding and earthing of structure complete including excavtion of earth pit and of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt of aluminium bus bar pipe complete for h.t. bus bar arrangements for dp structure for triple pole and four pole structure of h.t. jumpering in dp structure complete of h.t. las of dt excluding loading and unloading upto 100 kva above 100 kva painting of
Sector: Power Sector