Details: charges for cutting the b.t surface to 5 to 7 cm depth using milling machine,conveying the milled waste materials to at least for 20km distance including hire and running charges for the machine,conveyance charges,unloading at unobjectionabe place,cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc..,complete as per the direction of the departmental officers. advance patch work 13.20mm providing advancve patch work using 50mm consolidated thickness by using 1 m3 of 13.20mm irc metal with 44kg of bittumen per 1 m3 of metal for pre mixing for existing surface advance patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70kn power roller for premix carpet and seal coat seperately including labour
Sector: Municipality