Details: uprooting of juliflora tree plants including seemaikaruvelan tree plants and other plants grouth, stacking at one place for disposal and disposing off to a far away place as directed by the engineer at site, including cost of labour charges loading unloading stacking lead, lift, t&p’s etc., complete. earth work excavation in hard clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, and disposing the surplus earth away from the site to a lead of 3 km and initial lift of 2m and base should compacted by using hand roller and as directed by the engineer at site, including all labour charges, head load etc., complete. providing pcc 1:2:4 mix 20mm hb stone for foundation as per standard specification and as directed by the department engineer at site, including cost of all materials, shuttering charges, lead and lift etc., complete supplying, fabricating aligning vertical l-angle fence post using ms structural steel inc
Sector: Power Sector