Details: providing and laying 50mm consolidated thick dense bituminous macadam using 0.24cum of 26.50-13.20mm, 0.25 of 13.20-2.36mm and 0.23 of 2.36mm & below and with 53.20kgs of vg30/vg40 bitumen for premixing per 10sqm including cost and conveyance of all materials to cmp site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t cmp with bitumen boiler, tipper trucks, paver finisher /9m paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using cmp as per cl
Sector: Municipality