Details: charges for loading and unloading of new erw 200 nb nb m.s. pipe from stores to workspot. charges for dismantling of existing 200 nb m.s. pipes loading and unloading the same to stores as per the instruction of the engineer-in-charge. charges for , laying and welding of 200 nb m.s pipe line charges for fabrication of 200 nb bend from 200 nb m.s. pipe by cutting the required length of pipe, grinding and welding as per the required dimension including the cost of required consumables and hire charges for t&p etc., charges for fabrication of 'tee' piece 200 nb ms erw pipe. charges for providing necessary scaffolding arrangement for dismantling and of 200 nb pipes (service water pump 3 discharge to oht i) at 3.5 mtr elevation from the ground and removing after completion of the works. charges for cleaning and painting one coat of red oxide primer 200 nb pipe service water pump 3 discharge to oht1 including cost of consumable and paint. charges for painting two coat of enamel paint
Sector: Power Sector