Details: earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. plain cement concrete 1:4:8 (one cement four parts of crushed stone sand and eight coarse aggregates) using 40mm size iss hbg metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification centering for soffits of rcc slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and b.g 10 stiffened with m.
Sector: Municipality