Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 (pwd sor 2022-2023 p no 22) removal of excavated excess earth away from the site to 5k.m including loading and transportation charges etc, complete as per standard specification providing and laying, spreading and compacting graded stone aggregate to wet mix macadam (wmm) specification including premixing the material with water at omc in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibrat
Sector: Municipality