Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 removal of excavated excess earth away from the site to 5k.m including loading and transportation charges etc, complete as per standard specification. for 1m3 providing of granular sub base using grade i materials of table 400 -1 of morth with minimum cbr 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at omc and compacting with vibratory roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the
Sector: Municipality