Details: improvement works to 420 east road by layingwmm road from ch.390.00 m to ch.600.00m inside nctps-i premises(reach-iii). scraping the existing undulated /disturbed roadsurface upto a depth of 150mm, levelling anddisposing the collected ash away from the site,including cost of hire charges for machinery,materials, labour, lead, lift etc., complete as directedby the engineer at site. providing & laying, spreading and compactinggraded stone aggregates to wet mix macadam(wmm) including premixing the materials with waterat omc in mechanical mix plant carriage of mixedmaterials by tipper to site laying in uniform layers inbase course on well prepared surface andcompacting with power roller to achive the desireddensity.
Sector: Power Sector