Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete ss.20b 10 plain cement concrete 1:4:8 (one cement, four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification centering for soffits of rcc slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm x 60cm x and b.g 10 stiffened with m.s angles
Sector: Municipality