Details: earthwork excavation for narrow trenches in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick layers well rammed and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers providing pre constructional anti- termie treatment and creating a chemical emulsion of required concentration to raft slab and beam, under cellular raft slab ,around the footings,column pits, trenches etc complete.. supplying and filling with m. sand in foundation and basement of layers not more than 15 cm thick well rammed and consolidated including cost and conveyanc
Sector: Religious building